JOP LIMITED SPECIALISE IN PROVIDING INTEGRATED CONTRACTING SERVICES FOR ENERGY, INDUSTRIAL & COMMERCIAL CLIENTS

Our clients include South Hook LNG, Dragon LNG, Valero Energy, Puma Energy, SEM Logistics, Huntsman Corp, RWE nPower, BPA, Amec Foster Wheeler, Rhyal Engineering, Jenkins & Davies Engineering and Milford Haven Port Authority.

Our priority is our excellent Health & Safety record. We have worked over a million hours since our last Lost Time Accident in 1997. In 2016 we worked over 40,000 hours with ZERO accidents or incidents.

We are members of the Civil Engineering Contractors Association.

We are ISO 9001 certified.

We are ISNetworld safety system registered.

employee-image

CECA

Civil Engineering Contractors Association

employee-image

ISNetworld

Safety System

employee-image

ISO 9001

Quality Management System

Services


Construction Projects


  • We undertake groundworks, roadworks, drainage, demolition and reinforced concrete construction works.
Get in touch

Anti Corrosion Coatings


  • We undertake grit blast preparation to quality Sa 2 1/2, Apply industrial Hempel Paint to quality standard C5M and can complete works by Rope Access methods
Get in touch

Intumescent Coatings

We apply & maintain International Paint Intumescent coatings to steel work which swell up when heated, thus protecting the material underneath or sealing a gap in the event of a fire


Get in touch

Passive Fireproofing


  • We install & maintain both International Paint's Chartek and Promat's Fendolite passive fire protection systems.
Get in touch

Impervious Lining


  • We install Rawell Rawmat system for new or retrofit petro chemical resistant impervious bund lining
Get in touch

Term Contracts


  • We provide full scope facilities civil, grounds and building maintenance contracts on agreed rates and terms.
Get in touch

Provision of Labour


  • We supply labour for safety observers, firewatchers or civil works during turnarounds or upgrades
Get in touch

News


Working Supervisor (Painting/Fireproofing/General Maintenance)

Working Supervisor (Painting/Fireproofing/General Maintenance)

This opportunity is for permanent, full time Working Supervisor to work for JOP at South Hook LNG.

£15 per hour.

JOP have been going for nearly 50 years and have worked on various sites throughout Pembrokeshire and the UK. They have been awarded additional work at South Hook LNG and require a full time Working Supervisor.

DUTIES AND RESPONSIBILITIES:

  • Supervise several operatives carrying out painting/fireproofing works on site
  • Be required to work with the operatives as and when required
  • Quality inspections during and after the painting/fireproofing
  • Ensure permits available
  • Carry out tool box talks
  • Liaising with the client on a daily basis

THE IDEAL CANDIDATE NEEDS:

  • Proven experience in a similar environment
  • Enthusiastic, motivated & reliable
  • Methodical, hard-working ethos
  • Flexible attitude with the ability to learn and work quickly and retain information
  • Ability to work independently and manage several men

WORKING HOURS OF THE WORKING SUPERVISOR:

37.5 hours per week.

Monday – Thursday: 08:00 – 16:30; Friday: 08:00 – 13:30

Some overtime may be required to help meet business demands

Discretionary bonus.

Standard holiday entitlement of 21 days holiday per year plus bank holidays and a company pension scheme.

Immediate start available.

Apply now with a copy of your CV to discuss this position further with a member of our team.

Contact Us:

01646 682896

sales@jopwales.co.uk

 

 

Job Vacancy – Fireproofing Applicators/Industrial Painters

Fireproofing Applicators/Industrial Painters

This opportunity is for permanent, full time Fireproofing Applicators/Industrial Painters to work for JOP at South Hook LNG.

£10 per hour.

JOP have been going for nearly 50 years and have worked on various sites throughout Pembrokeshire and the UK. They have been awarded additional work at South Hook LNG and require several fireproofing applicators/industrial painters.

DUTIES AND RESPONSIBILITIES:

  • Carrying out preparation works to areas prior to fireproofing/painting
  • Fireproofing (fendolite/chartek) work
  • Industrial painting work
  • Quality inspections during and after the painting/fireproofing.

THE IDEAL CANDIDATE NEEDS:

  • Proven experience in a similar environment
  • Enthusiastic, motivated & reliable
  • Methodical, hard-working ethos
  • Flexible attitude with the ability to learn and work quickly and retain information
  • Work as part of a team but with minimal supervision

WORKING HOURS OF THE INDUSTRIAL PAINT SPRAYER:

37.5 hours per week.

Monday – Thursday: 08:00 – 16:30; Friday: 08:00 – 13:30

Some overtime may be required to help meet business demands

Standard holiday entitlement of 21 days holiday per year plus bank holidays and a company pension scheme.

Immediate start available.

Apply now with a copy of your CV to discuss this position further with a member of our team.

 

Job Vacancy – General Labourers

General Labourers

This opportunity is for permanent, full time General Labourer to work for JOP at South Hook LNG.

£9 per hour.

JOP have been going for nearly 50 years and have worked on various sites throughout Pembrokeshire and the UK. They have been awarded additional work at South Hook LNG and require several general labourers.

DUTIES AND RESPONSIBILITIES:

  • Providing assistance to fireproofing/painting operatives

THE IDEAL CANDIDATE NEEDS:

  • Proven experience in a similar environment
  • Enthusiastic, motivated & reliable
  • Methodical, hard-working ethos
  • Flexible attitude with the ability to learn and work quickly and retain information
  • Work as part of a team but with minimal supervision

WORKING HOURS OF THE GENERAL LABOURER:

37.5 hours per week.

Monday – Thursday: 08:00 – 16:30; Friday: 08:00 – 13:30

Some overtime may be required to help meet business demands

Standard holiday entitlement of 21 days holiday per year plus bank holidays and a company pension scheme.

Immediate start available.

Apply now with a copy of your CV to discuss this position further with a member of our team.

 

Liquid coating roof system in Tenby

JOP Ltd. Have been carrying out works on a property in Tenby, which involves specialist roofing materials to provide high quality and long lasting protection for the roof.
JOP are approved contractors and applicators of specialist Decothane products.
The initial roofing works involved installing a raised GRP trim, followed by the priming of the roof itself before installing a Vaper Carrier layer.
The detail work was carried out by using Decothane Ultra base coat and re-mat embedded into it, which covered not only the flat surface, but the incline as well.

Finally the works were completed with a Decothane Ultra top coat to seal and provide further protection for the roof.

Swansea Coastal Path – Langland to Caswell Bay.

JOP Ltd were awarded the contract for the resurfacing of the coastal path between Langland Bay and Caswell Bay, The Gower by the City & County Council of Swansea.

The works are located on the existing coastal path with rising coastal slopes, rock outcrops and cuttings through friable soils on the lanward side and both coastal slope and cliff edges to the seaward side of the pathway.

The works include the bench cutting of the inland side of the footpath to allow the laying of a new 1500mm wide gritstone aggregate footpath. The completed footpath will remove risks of the path being undercut/eroded, eliminate dangerous cross cambers, awkward slopes and steps, and be more suitable for pushchairs and wheelchairs.

Fireproofing at Puffin Produce

JOP Ltd were awarded the contract to carry out intumescent fireproofing on the new steel structure expansion for Puffin Produce in Haverfordwest.

The work involved prepping the steel work, priming it and apply the fireproofing with rollers and brushes before top coating (as requested by the client in an anthracite grey). All of the outside steel work has now been fireproofed and top coated.

Laugharne club house fireproofing for WB Griffiths

JOP Ltd were awarded the contract to carry out fire proofing on the new steel structure for a new clubhouse at Seasons cottages holiday park in Laugharne. The principal contractor carrying out the building works were WB Griffiths and JOP worked under them whilst carrying out the fire proofing.

Timeline:

• July 2018 – We inspected the steel structure and drawings and submitted our quote.
• August 2018 – We were awarded the works and commenced the second week in August. The work involved prepping the steel work, priming it and spraying the fireproofing before top coating. Due to two areas of the clubhouse being high in moisture (swimming pool and sauna areas), a specific type of top coat was needed to provide an extra layer of protection to the fire proofing.
• September 2018 – Works completed, one week ahead of schedule.

JOP staff are highly trained in fireproofing and coatings application (including rolling and spray application) and our painting inspector and supervisors have had 20 years plus experience of industrial coating application.

JOP always treat health and safety as our top priority and this contract was completed with over 1,000 hours on site with zero incidents or injuries.

JOP management undertook regular site visits to ensure the high standard of health and safety is being maintained on site.

A full QA pack was submitted to the client in line with our International applicators licence to give standard warranty cover for the client.

Please contact Mathew McMann, Assistant Manager for any quotation enquiries on 01646 682896 or

mathew@jopwales.co.uk

JOP’s head office has moved

JOP are proud that announce that our head office has moved to new premises at the Bridge Innovation Centre in Pembroke Dock. These high quality facilities allow for availability of meeting rooms and place JOP in the centre of business excellence in Pembrokeshire.

JOP Apprenticeships

JOP Limited would like to invite expressions of interest for painting/blasting & construction trade apprenticeships.

Please submit you CV and desired trade to sales@jopwales.co.uk

Previous experience, training completed and own transport would be of benefit.

Fairy Glen – Leat Repair

JOP Ltd have been awarded the construction works to complete the repair of Fairy Glen Leat in Old Colwyn, Conwy.

These works have been featured on the BBC website.

The repair works will feature the use of Concrete Canvas a innovative construction material manufactured in Wales.

HS2 Enabling Works – Meet the Buyer

Recently Dave Coleman, JOP Ltd General Manager,  attended a HS2 Enabling Works “Meet The Buyer” event on February 3rd at the NEC, Birmingham.

The event was facilitated by the Civil Engineering Contractors Association (CECA) of which JOP Ltd are long standing members.

The seven teams on contention for the High Speed 2 Enabling works are:
•Balfour Beatty Vinci JV
•Carillion/Eiffage/Kier JV
•Costain Skanska JV
•Laing O’Rourke/Murphy Group JV
•Fusion (Morgan Sindall/BAM/Ferrovial)
•Align JV (Bouygues/VolkerFitzpatrick/Sir Robert McAlpine)
•Momentum Infrastructure (Hochtief/Dragados/Galliford Try).

ISNetworld Success Story

JOP Ltd are now a featured success story with the ISNetworld Safety System.

ISNetworld has helped us immensely by reducing the administrative work and the time required contacting clients with document updates, such as safety programs and insurance compliance.

 

South Hook LNG – Construction of Car Park Upgrade

JOP Limited have recently completed a civil engineering project to upgrade  the existing Car Parking facilities for our valued client South Hook LNG Terminal. The project required traffic management, excavation, laying drainage, installing new lighting, paving, kerbs, tarmac and white lining. JOP Limited performed the role of CDM Principal Contractor on this project which was completed on time and with zero health, safety or environmental incidents or accidents.

Buncefield – Capping Layer

JOP Ltd have recently completed works to remediate, cut & fill and install an impervious capping layer over an area of 25,000 m2 for BPA in Buncefield Terminal, Hemel Hempstead. The work also involved the refurbishment of an existing lagoon and construction of a new pumping station. This project was completed with an excellent safety record of over 10,000 man hours without accident or injury.